Capital Campaign Phase I

Our Phase I revitalization work achieved the following:

  • Church remodel
    • Clean, beautify and repair all stained glass windows
    • Install new doors, replace panic bars, install ADA door openers
    • Modify altar platform for ADA access
    • Install ADA ramps
    • Replace carpet with tile
    • Shorten 6 pews for wheelchair space
    • Upgraded sound system
    • Upgrade lighting
    • Upgrade West-side confessionals for ADA access
    • Refinished benches
    • Repaired acoustic ceiling in rear of church
    • New cabinets installed in sacristies
    • New carpeting in sacristies
    • Replaced holy water fonts
    • Clean wood façade surrounding altar
    • Remove communion rail
    • Segregate baptistery using pillars from communion rail
    • Repair ceiling
    • Paint interior
    • Create custom furniture
    • Entry tile cleaned
    • “Narthex” wall tile cleaned
    • Remove, relocate and redesign ambo
  • Parish Hall upgrades
    • Repair roof
    • Replace HVAC units
    • Install wall padding
    • Install new phone system and equipment
    • Upgrade drinking fountains for ADA compliance
    • Install new convection oven
    • New blinds
    • Repair kitchen floor
    • Relocate kitchen gas shut-off valve
  • Saint John’s Hall/Seton Hall upgrades
    • Repair roof
    • Upgraded men’s toilet to comply with ADA standards
    • Reconstruct kitchen sink to comply with ADA standards
    • Replace cracked ceramic floor tiles
    • Replaced wall acoustical panels
    • New carpeting in Seton
    • Create Marian garden
  • Youth Room upgrades
    • Install unisex, ADA bathroom and storage
  • Campus-wide upgrades
    • New fire alarm
    • New security alarm
    • Re-key campus with a security key system
    • Run wiring underground to link Pre-K, Food Closet, Youth Room and Extension to phone, computer/technology, and alarm systems
  • Rectory/Parish Office upgrades
    • Replaced HVAC in rectory
    • Replace patio fencing around rectory
    • Install wrought iron fencing and automatic opener near rectory parking
    • Misc. carport repairs
  • School remodel
    • Classroom remodel
      • Remove all asbestos and re-tile all floors
      • New cabinets
      • Added electrical outlets
      • New blinds and curtains
      • Add sinks in classrooms without sinks
      • Creation of a science lab
      • Upgrade flooring in computer lab
      • Clean and repair skylights
      • Add insta-hots in all classrooms
      • Replaced all “chalkboards” and bulletin boards
      • Modified storefronts to update look, hide wiring, etc.
    • New intercom system
    • Extended bell system for security alerts
    • New door knobs and ADA levers
    • Upgrade the electrical system
    • Remodel nurse’s station and install ADA-compliant bathroom
    • Install unisex, ADA bathrooms
    • Rehabilitated existing bathrooms
    • Installed ADA compliant drinking fountains
    • Remove and replace acoustical tiles in ceiling
    • Upgrade computer/technology wiring to include additional outlets, CAT-6 cabling, etc.
    • Upgrade storage closet for new computer servers
    • Upgrade cabinetry in administration building
    • New desks
    • Upgrade front office
      • New front counter
      • Replace carpet with tile
      • Upgrade storefront for looks and ADA functionality
    • Clean quarry tile on classroom exterior and breezeway
    • Replaced courtyard landscaping with faux grass

Attendees



Click to download this to your calendar